In 2019, the production and sales of new energy vehicles in China were 1.2 million, a decrease of 50,000 vehicles over the previous year. Industry experts say there are many reasons for this, one of which is the lack of charging pile infrastructure, which is also the reason for charging pile construction to be included in the "new infrastructure ". In 2020, the trillion-scale "new infrastructure" started, charging piles as an important part of the new infrastructure, will usher in a new round of outbreak, with the "new infrastructure" blessing, the country is also in the introduction / revision of new charging pile support policy:
◆ the recent Hunan Development and Reform Commission said to speed up the construction of charging infrastructure;
◆ Hainan plans to start from 2020 to the province's electric vehicle charging infrastructure in batches of construction and operation subsidies;
◆ guangxi province issued "energy network" related construction plan, plans for charging facilities for three years investment of $1.394 billion, new new energy vehicle charging piles 20335;
◆ Beijing issued 2019-2020 charging construction and operation subsidy for consultation, construction supplementary standard is 7 kW and below charging subsidy 0.4 yuan / W,7kW above charging subsidy 0.5 yuan / W, daily reward standard is 0.1 yuan / kWh;
◆ the Shanghai Development and Reform Commission and other five departments issued the "Shanghai Interim Measures to promote the orderly development of electric vehicle charging (exchange) facilities interconnection ", in addition to the mention of supporting intelligent orderly charging policy and supporting the construction of intelligent charging piles in residential areas, more importantly, the subsidies for the operation and sharing of charging piles were raised to a new height.
◆ Guangzhou Municipal Bureau of Industry and Information on March 25," Guangzhou electric vehicle charging infrastructure subsidy fund management measures (revised draft for comments)." DC charging pile, AC and DC integrated charging pile, wireless charging facilities: according to the standard subsidy of 300 yuan / kW. AC charging pile: according to the standard subsidy of 60 yuan / kW. Power exchange facility project: according to 2000 yuan / kilowatt standard subsidy. New wireless charging facility subsidy standard :$300/kW
It is expected that the remaining provinces will also respond to the central call to continue to support the construction of recharge infrastructure, and the policy trend is positive.
Market space
In recent years, Supported by national policy, China's new energy automobile industry has been rapid development, The number of new energy vehicles is increasing year by year, And the number of charging piles is also explosive growth. According to the China Charging Union, As of February 2020, The total number of public and private charging piles nationwide is 1.219 million, year-on-year increase of 50.8%. Public charging piles increased from 57800 in 2015 to 516400 in 2019, Annual compound growth rate 72.89%; Private charging piles increased from 8000 in 2015 to 703,000 in 2019, Annual compound growth rate 206.17%; Car pile ratio has reached about 3.5∶1, But this is well below the planned 1-to-1 target.
At the end of 2019, Ministry of Industry and Information Technology issued "New Energy Automobile Industry Development Plan (2021~2035)" draft for comments, Planned for 2025, New energy vehicles account for 25% of new car sales. By 2030, China will have 80 million new energy vehicles, Pure electric vehicles or 64.2 million, According to the goal of 1:1 ratio, Over the next 10 years, There are 63 million gaps in charging pile construction in China, It is expected to form a market of 102.53 billion charging pile infrastructure construction. With the "new infrastructure ", Charging pile industry is expected to usher in the second spring of development, The number of charging piles will also usher in a new burst of growth.
As a complete solution provider in the field of electric vehicles in the middle of the industrial chain —— new pages of technology open technology and products, business and service models, connecting the country's outstanding agents, sharing wealth heights.
New Page City Agents: The Best Interference Period for Industrial Outbreak
Three major agency advantages
1. products are profitable
2. Step High Return Point
3. outstanding agents to award new energy vehicles worth 5 to 600 million
Protection of Seven Rights
1. support agent to participate in local project bidding, provide full resources
2. regional security, priority supply, premium prices and benefits
3. special support area, local development and operation plan for city
4. flexible and diverse preferential financial services
5. sales, management, technology and after-sales professional training system
6. annual event crowned, reward chips upgraded
7. achieve the goal of competing for the rights and interests of city agents or joint ventures, sharing wealth and dividends
01 Agent Qualification
1.1 Independent legal personality, strong marketing and economic strength
1.2 Scope includes, but is not limited to, power, communications, new energy vehicles, three-dimensional garages, intelligent robots, artificial intelligence, charging piles, etc.
02 Investment Promotion Planning
Recruitment of all prefectural level regional exclusive agents, agents can develop their own offline secondary or tertiary agents.
03 Agency Cooperation Process
The agency cooperation consultation —— submits the agency cooperation application form, the information registration —— submits the agent qualification —— examination —— signs the agency contract —— the training
New page DC fast charging pile / AC pile based on the present, incorporated into the new energy automotive industry development tide, the fuselage more industrial style design sense, in the market popular charging pile stand out, recognition and performance parallel, the battle market both hands.
In particular, it is worth mentioning that the new page has been the world's first small batch of industrial applications of wired wireless integrated piles, but also in the existing cable piles directly iterative upgrade, a parking space dual-use, just like mobile phones, the future will also have an era of electric vehicles wired wireless charging parallel driving.
New page technology electric vehicle wireless charging pile, wired wireless integrated pile, for electric, network connection, intelligent, shared and other "new four" electric vehicles, such as intelligent network connection vehicles, driverless, self-driving future mainstream cars, provide intelligent wireless charging, product lifeline evergreen and frontier.
Wireless charging technology can realize new energy electric vehicle parking that is charging, while walking charging, charging remote control, automatic parking and self-driving self-charging applications.
Intelligent charging cloud platform, big data operation monitoring platform, for the whole system of products escort, the full set of overall service plan more worry-free.
New page new energy wireless charging industry park, located in the new page intelligent charging pile production and research base and wireless charging industry park, the industrial park covers an area of about 260 mu, the existing standard factory building 110,000 square meters, R & D office building and laboratory up to 10,000 square meters, more than 20,000 flat dormitory. new page new energy wireless charging industry park is a collection of "electric vehicle wireless charging VA module research and production manufacturing, intelligent charging pile machine manufacturing, mass entrepreneurship and innovation base, wireless charging technology application and testing, upstream and downstream industry cooperation, standard system construction and development" in one of the industrial park. To provide new page agents with more stable and reliable, more cost-effective technology and product support and protection.
For more information, please call the following line or scan code for details